& Partners
A nation is judged by what reaches the last home.
Politics is the promise. Governance is the delivery. Pritiraj & Partners advises those who govern, and those who seek to, on closing the distance between the two.
The firm
Partner-led, or not at all. The partner who wins your confidence in the first meeting leads the fieldwork, writes the memorandum, and sits across the table when the decision is taken. Selected mandates, taken on a project basis; the names attached to past mandates are never disclosed.
The Practice
Programme design and delivery
Designing the scheme itself, the delivery unit that runs it, and the measurement that makes its performance contestable.
Political strategy and narrative
The argument a leader runs on, built from what voters say; booth-level targeting, alliance arithmetic and war-room discipline.
Field research and public listening
Surveys sampled to the polling station, influence mapped constituency by constituency, verified by 150 field partners.
Institutional capacity
Whether the organisation can carry the mandate: structure, span of control, accountability lines, and counsel in crisis.
Instruments
Three instruments, each with a fixed scope.
Delivery Diagnostic
A ground-truthed assessment of one flagship scheme: where it leaks between sanction and beneficiary, why, and a costed correction plan.
- Scope
- One scheme
- Duration
- 6–8 weeks
- Fee
- Fixed, upfront
Constituency Intelligence
What voters are saying, where the organisation is thin, and the ninety days of work that would change both.
- Scope
- One constituency
- Duration
- Six months minimum
- Fee
- Fixed
Last Mile Index
A stage-by-stage, field-verified measure of scheme delivery across Indian states. See the sample edition.
- Scope
- Indian states
- Cadence
- Quarterly
- Basis
- Field-verified
Method
Twelve weeks from ground truth to a plan.
- Weeks 1–4Ground truth
Field study, opposition and incumbency analysis, and document review against the ground.
- Weeks 5–8Strategy
Options priced and sequenced, ending in a written recommendation.
- Weeks 9–12Architecture
A 30–60–90 day plan, monitoring design and review cadence.
- OnwardReview
Reviews against the plan’s own exit criteria, documented in writing.
The Ethics Charter
Four articles that bind every mandate.
- Article INo deception
No voter deception, no coordinated inauthentic behaviour, no communal or divisive messaging, at any fee.
- Article IIOne side only
No simultaneous mandates for direct electoral competitors. A conflicts register is checked before every proposal.
- Article IIILawful, in writing
Full compliance with the Model Code of Conduct and election law. Counsel is documented in writing.
- Article IVNo outcome fees
Fees are never contingent on electoral outcomes.
Where we work
Mandates won across India, run from Bengaluru.
Headquartered in Bengaluru, with standing presence in New Delhi for government work and in Guwahati and Shillong for the North East. Electoral mandates designed and won in Rajasthan, West Bengal, Assam, Meghalaya, Arunachal Pradesh and Karnataka.
Read the terrain notesBegin a mandate
Two lines on your situation, and the decision you face.
Enquiries are read by a partner, confidential by default, and answered within two working days.
Begin a mandate